Auto-populate completion date from start date and duration

When the start date of a scheduled item changes, the scheduled completion date should update automatically based on the item's duration days instead of requiring a manual edit. Duration days should remain unchanged when the completion date recalculates. This would remove a repetitive manual step in schedule creation.

Payce M.2 hours ago
Completed

Help center: five orphan placeholder articles sit in Featurebase with no content β€” write or delete them (one duplicates a live article)

What pnpm docs:sync:pull surfaces five articles that exist in Featurebase but had never been committed. All five are abandoned docs:sync:new reservations, not dashboard-authored content β€” every one carries the literal placeholder body … β€” draft. Replace this body before merging. , is state: "draft", and has no icon. They were committed to the repo in PR for TPTM-3407 (commit 7ab044ebd) so the debt is visible and tracked rather than re-surfacing on every pull. Committing them did not resolve them β€” the repo now carries five articles whose source of truth says "Replace this body before merging". | id | title | collection | | -- | -- | -- | | 2617421 | Connect Claude to TPTM | builder-configuration | | 8347566 | AI Connectors | builder-configuration | | 9982008 | Connect Perplexity to TPTM | builder-configuration | | 6660540 | On-screen Messages | user-guides | | 1505935 | Manager View | tracking-progress | The duplicate 1505935 "Manager View" duplicates a live article. The real one is 3991535-manager-view β€” 136 lines, a full description, an icon, state: "live", in the same tracking-progress collection. 1505935 is a 12-line placeholder that was reserved with almost the same title and never filled in. It should be deleted, not written. Two of its titles would otherwise compete in help-centre search and in the AI support assistant's corpus the moment anyone flipped it live. Why this needs a human Deleting an article is a Featurebase dashboard action β€” the sync deliberately cannot do it, and docs/help-center/README.md records that deleting the file only produces an "orphan" report. So each of the five needs a decision: 1505935 β€” delete in the dashboard, then git rm the file. (Recommended; it duplicates 3991535.) 2617421 / 8347566 / 9982008 β€” the three AI-connector articles look like genuinely planned work. Either write them or delete them. 6660540 "On-screen Messages" β€” no description either; decide whether this is still wanted. Acceptance criteria [ ] Each of the five is either written (real body + description, passing pnpm docs:audit --id ) or deleted in the Featurebase dashboard with its file removed from the repo. [ ] 1505935 specifically is resolved against 3991535 rather than written as a second Manager View article. [ ] pnpm docs:sync:pull afterwards produces no untracked placeholder files. Notes Pre-existing, unrelated debt found in the same sweep, NOT part of this ticket: _uncategorized/0218204 and _uncategorized/1311207 are both "Understanding Lot Holds" with real (duplicated) content, and admin-portal/8847914 is titled "This is the title" with Featurebase's own element-reference body. Those are already committed and have their own history.

Linear18 days ago
In Progress

Field app: help-center "Mobile App" collection β€” install, sign-in, working offline, what "applied on sync" means, photos and walks on the phone

Goal Customer documentation ships in the same PRs as the features (Help Center Documentation Gate), but the collection itself needs creating once: a "Mobile App" collection in Featurebase (mcp__featurebase__create_collection), then pnpm docs:sync:pull to materialise docs/help-center/mobile-app/collection.json (IDs never hand-written). Articles (via help-center-writer, IDs reserved with pnpm docs:sync:new): Installing the field app; Signing in and choosing your builder; Working offline and the sync indicator; "Applied when you're back online" (pay points, buyer photos); Lot walks on your phone; Photos on your phone; Troubleshooting sync (retry, discard, full resync). Existing articles that now describe the web only (Field View 1572819, Lot walkthroughs 3699906, Lot details 3797710) get a "On the mobile app…" section. Acceptance criteria [ ] Collection exists and is committed; pnpm docs:sync and pnpm docs:audit pass (Overview β†’ tasks β†’ FAQ shape). [ ] Every in-app "Learn more" link in apps/mobile points at a reserved article id. [ ] Article URLs listed in this issue.

Linear23 days ago
In Progress

Featurebase messenger + changelog widget dominates client-side pageload cost on the lot detail route

Found while investigating TPTM-3215 (lot detail page perf audit). Not fixed as part of that PR β€” filing as a follow-up. Evidence (Sentry spans dataset, tptm project, 7d/30d windows, lot detail route): ~6 Featurebase requests fire per pageload: sdk.js β€” p95 1.17s widget/config β€” p95 1.46s changelog/widget/config β€” p95 1.30s conversations/list β€” p95 1.33s tickets/list 2 CSS files This is the single biggest client-side contributor to pageload time on the route β€” bigger than any of the route's own data fetching. Suggestion: defer Featurebase SDK boot behind an idle callback or first user interaction instead of loading it eagerly on every app pageload. Related to TPTM-3215.

Linear1 month ago
Rejected

Test issue

I’m having this issue

Linear3 months ago

Add multiple progress photos at once

When adding a progress photo, allow adding one or more at once.

Alex Z.4 months ago
Completed

Lots not marked as walked properly

Users are reporting lots not staying marked as walked. This affects the field, view, lot list on the community page, and daily reports.

Linear7 months ago
Planned

Print QR Code without opening a new tab

When printing a QR code from the lot details page, I want clicking on the button to go straight to print instead of opening a new tab to print.

Linear7 months ago
Rejected

Assign multiple project managers to one Lot

Allow lots to have one or more project managers

Daniel H.7 months ago
Completed

Fantom navigation highlight

The field view is partially highlighted in the side navigation menu when another item is actually selected.

Linear8 months ago
Completed

Highlight Today in Schedule Timeline by Default

In the Overall Timeline Schedule, highlight today’s column by default even when I refresh the page or come back to the page later after changing the highlight date.

Jerry A.8 months ago

Lot Stage Report: Add Aging/Duration-Based Cell Highlighting

I want the Lot Stage Report to automatically highlight cells based on how long a lot has been in that stage for (aging/duration highlighting). This is important for quickly identifying lots that are stalled or taking too long in a specific stage. Metadata: source: ai_chat conversationId: 97

Linear8 months ago

Unarchive Lots

Add an option to unarchive archived lots

Wyatt C.8 months ago
Completed

Duplicate templates showing old tasks when using to schedule

After duplicating a template and changing the tasks, when going to use that template to schedule a task, the old, deleted tasks are appearing.

Linear8 months ago
Planned

Add 4 week window notice to reports

Trade partner reports - excluding the schedule calendar - only show tasks for the next 4 weeks. Without knowing this, trade partners may think that they do not have any upcoming tasks. Update reports that have this time window to have a note at the bottom to call this out. When there are no tasks on the report, add a note if there are no tasks or if there are no tasks within the window.

Harris V.9 months ago
Completed

Make Trade Partner Dropdown Searchable

Update the trade partner dropdown in the start and next apps so that they are searchable. When making them searchable, instead of matching anywhere in the string, just do a case insensitive match from the beginning. Create component tests to validate this expected behavior.

Jerry A.9 months ago
Completed

Reassign Tasks to Trade Partner

🎯 Goal: Re-assign some or all of the existing tasks for that trade to the new trade partner. πŸ€• Current Pain: To re-assign tasks for one trade to a new trade partner, you have to edit each task and make the assignment. βœ”οΈ Requirements Tool available at the community level Controls over which tasks are assigned from one trade partner to another Move all Select by lot Select by trade partner Individual selection override

Alex Z.9 months ago
Completed

Add file link to communities

Communities should have an optional link to store files like lots.

Harris V.10 months ago

Confirm before moving schedule

Before making a change to the schedule that would affect the projected close date Ask the user to confirm the change Collect a reason for the change (optional) This will help users be aware of when the projected close will change and proactively provide reasons instead of retroactively. This new capability would be available when Changing the due date of a critical path item when editing a task Moving a schedule from the schedule overview

Alex Z1 year ago

Critical Path Task Tag

Add a tag next to a critical task in the lot checklist to easily identify critical tasks.

Kyle W.1 year ago